Stellar IT Park

Cut costs, not corners...Relocate to Stellar IT Park

Salient Features of the Project

Parking Area
  • Double basement/ Surface for Parking of approx 900+ cars
Air Conditioning
  • Central Air Conditioning with energy efficient variable speed drive centrifugal water cooled chillers (York make)
  • Use of Heat Recovery Units-The fresh air load is reduced by the use of Heat recovery units.
  • Use of Plant Manager-Takes advantage of the lowest cost energy option, hence major power saving.
Fire Fighting
  • Sprinkler and fire detection system will be provided in the basement area and common area as per NBC norms.
  • Sprinkler installation in main office area will be a part of the fit outs. All AHU's and other ventilation/pressurization systems are operationally hooked up with fire alarm/detection systems. Stair cases and lift well pressurization systems in place.
Wash room
  • 2 sets of Gents & Ladies Toilets on each floor
  • CP fittings, Floor finishes, interiors will be the part of fit out option.
  • Plumbing provision for extra toilets may be given at one / two different locations for the large floor plates.
Electricity/Telephone
  • Provision on each floor up to the shaft.
Security Systems
  • Boom Barriers with access control shall be provided for car entry and exit in the basement.
  • CCTV surveillance systems for basements and will be monitored by the security staff.
Business Support Services & Amenities
  • Multi-cuisine Food court
  • Cafe
  • Gymnasium
  • Bank & ATM
  • Business Center
  • Convenience Shopping
Green building concepts followed
  • Fly ash bricks as building material
  • Sewage treatment plant for treating the effluents and recovery of waste water.
  • Energy efficient VSD centrifugal chillers with plant manager
  • Heat recovery units to reduce HVAC load
  • Dual flush systems in common toilets