| Parking Area |
- Double basement/ Surface for Parking of approx 900+ cars
|
| Air Conditioning |
- Central Air Conditioning with energy efficient variable speed drive centrifugal water cooled chillers (York make)
- Use of Heat Recovery Units-The fresh air load is reduced by the use of Heat recovery units.
- Use of Plant Manager-Takes advantage of the lowest cost energy option, hence major power saving.
|
|
Fire Fighting
|
- Sprinkler and fire detection system will be provided in the basement area and common area as per NBC norms.
- Sprinkler installation in main office area will be a part of the fit outs. All AHU's and other ventilation/pressurization systems are operationally hooked up with fire alarm/detection systems. Stair cases and lift well pressurization systems in place.
|
|
Wash room
|
- 2 sets of Gents & Ladies Toilets on each floor
- CP fittings, Floor finishes, interiors will be the part of fit out option.
- Plumbing provision for extra toilets may be given at one / two different locations for the large floor plates.
|
|
Electricity/Telephone
|
- Provision on each floor up to the shaft.
|
|
Security Systems
|
- Boom Barriers with access control shall be provided for car entry and exit in the basement.
- CCTV surveillance systems for basements and will be monitored by the security staff.
|
|
Business Support Services & Amenities
|
- Multi-cuisine Food court
- Cafe
- Gymnasium
- Bank & ATM
- Business Center
- Convenience Shopping
|
|
Green building concepts followed
|
- Fly ash bricks as building material
- Sewage treatment plant for treating the effluents and recovery of waste water.
- Energy efficient VSD centrifugal chillers with plant manager
- Heat recovery units to reduce HVAC load
- Dual flush systems in common toilets
|